¡°At present, the land clearing and leveling work has been completed, and we are currently excavating the foundation of the dome and the foundation of the urban building planning part.¡± In a conference room at the construction site, the engineer was introducing the construction progress of the project to Chen Xin.
The excavation of the building foundation is the top priority of the entire construction project. In a sense, it is not an exaggeration to regard it as the most important part.
"Tall buildings rise from the ground" The foundation is the foundation that determines whether the building is strong, solid and durable.
If the foundation of a building is not laid well, even if it is built, it will be a house of paper that will fall down as soon as it is pushed.
??This point does not need to be emphasized deliberately for Yan Guo, a country with a major infrastructure construction country. Yan Guo's engineering team does not need to be reminded to complete the construction in accordance with the project requirements.
"Well, I saw this just now. It looks like you did a good job." Chen Xin had a smile on his face and seemed to be very satisfied with the construction progress of the engineering team.
Hearing what Chen Xin said, the engineer immediately smiled. Although Chen Xin was not his superior, it was obvious that Chen Xin's recognition was still a happy thing for him.
However, while praising it, Chen Xin also asked the engineer: "Did you excavate the building foundation first and then build other supporting facilities?"
This is what Chen Xin was curious about when he inspected the construction site just now. The workers were digging the foundation, and they were digging very deep, but they were basically limited to the construction area planned on the design drawing.
The remaining land has only been leveled and has not been excavated.
But according to the design drawings, various supporting facilities will also be built on the non-building part of the land, so Chen Xin has this question.
After all, this is an entire city. It is impossible to build only houses. Supporting facilities such as sewers, drainage pipes, and heating pipelines will also be laid, not to mention city-level power supply lines and dome lighting systems.
In the future, in this dome city, lighting will be used to simulate changes in light to artificially create the difference between day and night.
"Yes, according to the construction plan, the progress of this phase is mainly to excavate the building foundation. As for the supporting facilities, according to the construction plan, construction will be carried out after the foundation is completed." The engineer explained to Chen Xin, although Chen Xin is not his boss, but Chen Xin's identity is undoubtedly more important than his boss, and engineers need to answer any questions he has.
After listening to the engineer¡¯s explanation, Chen Xin didn¡¯t have any special views or opinions. He didn¡¯t know much about engineering construction, so he only asked what he didn¡¯t understand.
"However, after the engineer explained, Chen Xin still nodded pretending to be clear and didn't ask any more questions.
However, a designer on the side took the initiative to speak at this time and said to Chen Xin: "This is mainly due to the special circumstances of the dome city. According to our plan, the heating energy tower and the main body of the dome will be completed first. Then increase the temperature under the dome and restore the temperature of the entire construction environment to above zero, which can greatly reduce the difficulty of construction and allow the original construction machinery to function."
Chen Xin can understand this. Most of the original construction machinery used diesel, and when diesel reaches temperatures of tens of degrees below zero, even high-grade diesel can easily condense, causing the diesel engine to be unable to start.
Not to mention that these construction machines themselves are very rugged in design, and the cabs are not designed to be windproof and cold-proof. In this weather, even if the driver wears protective clothing, the joystick will freeze.
¡°But if there is dome insulation, the temperature of the construction site under the dome can be raised above zero, and these originally unusable construction machinery can naturally be put to great use.
After all, even with the help of the Engineering Titan, excavation on frozen soil and excavation on ordinary soil are two completely different difficulties.
Therefore, when formulating the construction plan, some people proposed to complete the dome and energy tower first, so that they can not only obtain electricity through the energy tower to ensure the electricity consumption of the construction site, but also rely on the insulation of the dome to warm up the temperature of the entire construction site and let the frozen soil Melting reduces construction difficulty.
"This has been determined before, so I'm not worried." Chen Xin nodded and talked about another thing: "The Dome City is an ecological city, and the ecological environment is the most important thing for this city. , so I hope you can also pay attention to this issue during the construction process."
Chen Xin cannot help but emphasize this issue. The design of the dome city emphasizes its important role in rebuilding the ecology. Therefore, all parts of the city are built around the core of green ecology.
Not only are there all kinds of green plants in the city, but the design of a series of supporting facilities such as the city¡¯s water cycle and garbage disposal have adopted the most environmentally friendly design, in order to enable the city to create the most perfect ecology in the future. The environment comes out.
And building construction itself is the most ecologically damaging. No matter how careful you are during the construction process, this will still cause more or less impact.
Chen Xin¡¯s reminder also hopes to minimize the impact on the ecology during the construction process.
Even if there is no ecology on the construction site of the dome city now, once the dome is built, this will be a problem that must be faced. If we are not prepared now, it will be a big trouble if something goes wrong in the future.
Regarding this issue, both engineers and designers have long kept it in mind, and they also paid great attention to this during the previous construction process.
Now that Chen Xin brought it up again, both of them nodded in unison and said, "Academician, please rest assured that we will not be careless about ecological issues."
While guaranteeing Chen Xin, the engineer also highlighted their efforts during the construction process: "We strictly followed the construction requirements during the construction process, and the protection of the environment and ecology was also emphasized from the beginning. Implemented on everyone's head.
All workers have received relevant education, and relevant responsibilities have been clarified. We will make every effort to ensure that the entire construction is foolproof.
Regarding the impact on the ecological environment during the construction process, the parts that can be restored will be restored after the construction is completed, and the damage that cannot be restored will be minimized as much as possible to ensure that the impact on the ecology and environment during the construction process is reduced. to the lowest. "
"I feel relieved when I hear you say that." When the engineer said this, Chen Xin smiled even more.
Since he has decided to live here in the future, Chen Xin certainly hopes that his new home will have a better environment in the future. (Remember the website address: www.hlnovel.com