Add Bookmark | Recommend this book | Back to the book page | My bookshelf | Mobile Reading

Free Web Novel,Novel online - All in hlnovel.com -> Romance -> take off my aviation age

Chapter 1494 The Biggest Winner

Previous page        Return to Catalog        Next page

    What¡¯s more, Zhuang Jianye has already missed an opportunity.

    You must know that the West-East Gas Transmission Project, as another super project after the Three Gorges Project, has been planned since 2000.

    Naturally, it has attracted the attention of a large number of domestic and foreign related companies.

    Especially the high value-added supporting equipment involved in the project has attracted many companies.

    ¡°This naturally includes China¡¯s take-off.

    In addition to related construction machinery and design outsourcing services, the most attractive thing for China Tengfei is the more than 100 valve regulating stations on the oil and gas pipelines of more than 4,300 kilometers in the first phase of the project, involving an industry worth more than 50 billion yuan.  Gas turbine equipment.

    However, this bid for China Takeoff encountered an unprecedented Waterloo.

    Not only has nothing been found in terms of high-power gas turbines, but there are only 32 spare 8-MW medium-sized gas turbines, with a total value of less than 1 billion yuan.

    It does not even account for 2% of the total investment in gas turbines in the first phase of the West-East Gas Pipeline. This is far from the goal of at least 20% of the total investment in related categories in China¡¯s take-off plan.

    Because of this, not only did the relevant leaders of China Ascendas Aviation Power Co., Ltd. (Group) conduct a review at public meetings, but Zhuang Jianye also emphasized at several internal meetings that the lessons of this failure should be summed up, and that past achievements should not be relied upon.  If we are blindly optimistic, if we slack off, the entire China Takeoff is in danger of collapse. The failure of the bidding for the first phase of the West-East Gas Transmission Project is the best warning to China Takeoff.

    Zhuang Jianye is absolutely right.

    With the development of China Ascendas Aviation Technology, China Ascendas Aviation Power Co., Ltd. (Group) Co., Ltd. has also made rapid progress in aviation engines, and the field of industrial gas turbines has also developed rapidly.

    Especially the battle of the century with GE in the mid-1990s, which not only destroyed the gas turbine business of Mitsubishi and Siemens in China, but also firmly controlled the industrial gas turbine market below 10 MW in its own hands.

    In the following years, China Ascendas Aviation Power Co., Ltd. (Group) relied on its market dominance in the field of industrial gas turbines below 10 MW to make rapid progress, conquering cities and territories, including the Tarim Oil Field, Hankou's ultra-large polyethylene, and the East China Sea offshore drilling platform.  , the comprehensive power generation system of Beijing Olympic venues and other major projects for industrial gas turbine supporting equipment.

    Relying on the huge profits gained from these supporting projects, China Ascendas Aviation Power Co., Ltd. (Group) Company is even more outstanding in aero-engine technology. By the turn of the century, it was on an equal footing with the Aviation Engineering Corporation, a subsidiary of the Aviation Industry Corporation of China.

    Watching China Ascendas Aviation Power Co., Ltd. (Group) flourish in both aviation engines and industrial gas turbines and making money, it naturally arouses the envy and jealousy of domestic and foreign friends.

    Needless to say, ge is an old enemy. Especially in the battle of the century, 80% of ge's industrial gas turbine business under 10 MW was taken away by China Tengfei. Today, its domestic market share is only a pitiful one.  15%, at an absolute disadvantage.

    "Destroying people's wealth is like killing their parents. It can be said that ge and China's take-off can be said to be incompatible with each other."

    Next is the Russian Aerospace Power Corporation. This Russian company that integrates CIS-related aerospace and industrial gas turbine-related factories originally wanted to make some quick money at home by relying on the old capital left by the Soviet Union. As a result,  First, the technological output of heavy-duty military aircraft engines was ignored due to the breakthrough of China's domestically produced heavy-duty aircraft engines.

    The medium-sized aero engines subsequently exported were also swept away by China¡¯s wd-60 series with better performance.

    Not to mention industrial gas turbines. Industrial gas turbines below 10 MW were almost picked up and beaten by China Tengfei. That¡¯s all. The key is that 20 MW gas turbines also encountered great resistance because of China Tengfei¡¯s existence.  .

    It can be said that the Russian Aerospace Dynamics Corporation is as ruthless to China's takeoff as ge.

    Finally, there is the Aviation Engine Corporation, which was reorganized into several domestic aircraft engine factories. This large-scale first-class enterprise under the Aviation Industry Corporation of China has long been jealous of China Takeoff's dominance of the lucrative industrial gas turbine business.

    There was no way before. The various factories were not integrated and were in a state of fighting independently. They were simply vulnerable to China's take-off technology and scale advantages.

    ¡°However, when they reintegrated, they naturally thought in one place and worked hard in one place, which was enough to compete with China¡¯s booming aviation business in China.

    That¡¯s all. The key is that the Aviation Development Corporation has connections and foundations that foreign companies do not have. Coupled with its strong foundation, it is naturally extremely dissatisfied with China Ascendas¡¯ monopoly on the domestic industrial gas turbine business.

    ?????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????three people who are driven by China¡¯s powerful market operation and great success.The brothers and sisters who were overwhelmed by China's development momentum finally came together under the pressure of China's take-off and formed a convergence trend.

    The specific operation is that GE transfers several of its industrial gas turbine-related technologies below 10 MW; Roscosmos exports da-80 20-megawatt industrial gas turbine technology to the Aerospace Engineering Corporation through its Ukrainian branch.  .

    Having obtained the technology and manufacturing capabilities, the Aviation Development Corporation relied on its strong foundation to quickly and completely digest and absorb it, and soon launched a series of so-called "domestic" industrial gas turbines.

    Then, relying on its own strong network and relationships, it quickly seized the original market of China Tengfei.

    The first phase of the West-East Gas Transmission Project is the most typical example.

    Before its bidding, the Aviation Development Corporation had already known the exact time, and then one week before the start of the bidding, it accused China Ascendas of having a monopoly on industrial gas turbines below 10 MW, and quickly ordered several departments to carry out industrial investigation of China Ascendas.  Antitrust Investigation into Gas Turbines.

    After that, the public relations department of the Aviation Development Corporation launched an all-out attack. On the one hand, it accused China Ascendas of relying on its monopoly position to suppress competitors; on the other hand, it used the bitter card to promote the gas turbines it had worked hard to develop but was not recognized, causing many corporate employees to face difficulties.  They are in danger of being laid off, so we urge the relevant departments to take care of them.

    After some operations, the Aviation Development Corporation quickly suppressed China Takeoff and won a large order of more than 20 billion yuan in the first phase of the West-East Gas Transmission Project. However, the Aviation Development Corporation was not the biggest winner, because ge relied on 280  The super-large order of RMB 100 million has become the most profitable among gas turbine projects.

    The reason for this is very simple. All 20-megawatt industrial gas turbines have been handed over to ge.

    There is no way, only ge has the most mature technology, the most comprehensive performance and the richest experience in this field!

    ¡°The rest, whether it is the da-80 imported from Russia by the Aerospace Engineering Corporation or the 20-megawatt industrial gas turbine taken off by China, is still far from being practical.

    So when the person in charge of GE took the contract for the first phase of the West-East Gas Transmission Project, he smiled so happily. Do you think GE is on the fifth floor?  Wrong, we are actually on the tenth floor!

    If you like Soar My Aviation Age, please collect it: Soar My Aviation Age is updated the fastest.  (Remember the website address: www.hlnovel.com
Didn't finish reading? Add this book to your favoritesI'm a member and bookmarked this chapterCopy the address of this book and recommend it to your friends for pointsChapter error? Click here to report